Tamakoshi V HEP, 99.8 MW

Nepal
Detailed Engineering Design and Tender Document Preparation of Tamakoshi V HEP, 99.8 MW
Soluciones asociadas

Detailed Engineering Design and Tender Document Preparation of Tamakoshi V HEP, 99.8 MW

Tamakoshi V Hydroelectric Project is of 99.8 MW installed capacity and located approximately 170 km northeast of Kathmandu, the capital of Nepal and approximately 40 km away from the district head-quarter of Dolakha District- Charikot Bazaar. This project is conceptualized to develop as a tandom operation project with Upper Tamakoshi HEP. The intake site / underground interconnection system with Upper Tamakoshi tailrace outlet is located in Lamabagar VDC at an elevation of 1155.02 masl whereas the underground powerhouse lies at the right bank of Tamakoshi River just downstream of the Suri River confluence with Tamakoshi River.

Cliente Tamakoshi Jal Vidhyut Company Ltd.
Presencia Dolakha, Nepal
Periodo January 2017 to June 2021
Capacidad 99.8 MW

Services Provided

Subdominios relacionados

Los subdominios relacionados son:
Grandes centrales hidroeléctricas

Referencias relacionadas